SUBCONTRACT PACKAGES
UNDER CONTRACT SANRAL N.003-010-2017/9 FOR THE CAPACITY IMPROVEMENTS ON N3 SECTION1 FROM WESTVILLE VIADUCT (KM11.8) TO PARADISE VALLEY INTERCHANGE (KM 17.57)
T1.1 TENDER NOTICE AND INVITATION TO TENDER (SBD1)
AQUAEXR JV (PTY) LTD invites tenders from experienced EME/QSE subcontractors for the Construction of Work
Packages as detailed below for THE CAPACITY IMPROVEMENTS ON N3 FROM WESTVILLE VIADUCT (KM11.8) TO PARADISE VALLEY INTERCHANGE (KM17.57) endorsed by The South African National Roads Agency SOC Limited (SANRAL). This project is in the province of KwaZulu Natal in the district municipality of EThekwini Metro Municipality.
Only tenderers who comply with the definition of a Targeted Enterprise under clause 2.1.1 and are at least 51% Black owned and who is an EME or QSE or a cooperative, are eligible to tender.
Only tenderers who meet the minimum functionality score as stated in clause C3.11.1 will be evaluated further on price and preference.
It is estimated that tenderers should have a CIDB contractor grading designation as indicated in the table below:
TENDER PACKAGE NUMBER |
TENDER DESCRIPTION |
CIDB |
DURATION |
Clarification Time
|
Clarification method |
N003-10-2017/9 CPG 015 |
Stormwater drainage on N3 Lot 1 (Km11.8 to Km13.2) |
Grade 4CE |
6 Months |
18/03/2024 13.00 pm |
Upload via link |
N003-10-2017/9 CPG 016 |
The Construction of Eden Road Overpass bridge B0283 on M13 |
Grade 6CE |
8 Months |
18/03/2024 13.00 pm |
Upload Via link |
N003-10-2017/9 CPG 017 |
Construction of MSE Wall W316 on M13 Eden Road |
Grade 5CE |
6 Months |
18/03/2024 13.00 pm |
Upload Via link |
N003-10-2017/9 CPG 018 |
Construction of MSE Wall W324 on N3 Off-Ramp(Paradise Valley) |
Grade 6CE |
6 Months |
18/03/2024 13.00 pm |
Upload via link |
N003-10-2017/9 CPG 019 |
Construction of MSE Wall W337 on N3 At Westville Viaduct |
Grade 7CE |
9 Months |
18/03/2024 13.00pm |
Upload via link |
N003-10-2017/9 CPG 020 |
Construction of MSE Wall W336 on N3 On-ramp (Harry Gwala Road) |
Grade 6CE |
6 Months |
18/03/2024 13.00 pm |
Upload via link |
N003-10-2017/9 CPG 021 |
Construction of Insitu Concrete Culvert CL404 on N3 (Westville Viaduct) |
Grade 3CE |
8 Months |
18/03/2024 13.00pm |
Upload via link |
N003-10-2017/9 CPG 022 |
Construction of MSE Walls W318&W319 on M13 Ramp B2 |
Grade 6CE |
7 Months |
18/03/2024 13.00pm |
Upload via link |
N003-10-2017/9 CPG 023 |
N3 Steel Reinforcing Supply and Fixing at Lancaster (B0461) |
Grade 4CE |
8 Months |
18/03/2024 13.00pm |
Upload via link |
N003-10-2017/9 CPG 024 |
Stormwater Drainage on N3 From Km13,2 to Km17.5 |
Grade 4CE |
8 Months |
18/03/2024 13.00pm |
Upload via link |
The tenderers attention is drawn to clause 2.1.1 of the Tender Data for each work package when submitting their tender.
Tenders from tenderers registered as potentially emerging enterprises but with a CIDB contractor grading designation lower than a contractor grading designation determined in accordance with the sum tendered, or a value determined in accordance with Regulation 25(7A) of the Construction Industry Development Regulations, will not be accepted.
Only locally produced or locally manufactured goods with a stipulated minimum threshold for local content and production as stated in the Tender Data will be considered.
Preferences are offered to tenderers who comply with the criteria stated in the Tender Data.
Only one subcontract package shall be awarded to an individual entity at any one time for this project, meaning that a Targeted Enterprise may be awarded a work package and on conclusion thereof may be awarded an additional work package, but more than one work package may not be awarded simultaneously for this project.
SUBCONTRACT TENDER DOCUMENTS
Tender documents are available at no cost in electronic format via e-mail or the following link.
(https://1drv.ms/f/s!AgwkV93iNPul9Epm7nJOmK5vm1c1?e=2FwmZR)
Prospective tenderers may send a request or queries to the following address cpg@aquaexrjv.co.za or shane@lionbee.co.za.Tenderers must have access to Microsoft Office © 2013 and Acrobat Adobe ©9.0, or similar compatible software.
As per table above and stipulated dates all advertised packages will have a prerecorded tender briefing uploaded via the link above.
The closing time for receipt of tenders will be as table below at 39 Alexander Road Westmead Pinetown KZN.
Telegraphic, telephonic, telex, email, facsimile, and late tenders will not be accepted.
Submissions from tenderers who arrived late at the tender clarification meeting will not be accepted.
Tender documents to be deposited into the tender box situated at 39 Alexander Road Westmead Pinetown KZN. 29°49’07.00” S. 30°50’00.00” E.
Tenders may only be submitted in the format as stated in the Tender Data.
TENDER PACKAGE NUMBER |
TENDER DESCRIPTION |
CIDB |
DURATION |
Submission of tender Documents 39 Alexander Road Westmead Pinetown Kwazulu Natal |
|
|
|
|
|
Date |
Time |
N003-10-2017/9 CPG 015 |
Stormwater drainage on N3 Lot 1 (Km11.8 to Km13.2) |
Grade 4CE |
6 Months |
25/03/2024 |
13.00 PM |
N003-10-2017/9 CPG 016 |
The Construction of Eden Road Overpass bridge B0283 on M13 |
Grade 6CE |
8 Months |
26/03/2024 |
13.00 PM |
N003-10-2017/9 CPG 017 |
Construction of MSE Wall W316 on M13 Eden Road |
Grade 5CE |
6 Months |
26/03/2024 |
13.00PM |
N003-10-2017/9 CPG 018 |
Construction of MSE Wall W324 on N3 Off-Ramp(Paradise Valley) |
Grade 6CE |
6 Months |
27/03/2024 |
13.00PM |
N003-10-2017/9 CPG 019 |
Construction of MSE Wall W337 on N3 At Westville Viaduct |
Grade 7CE |
9 Months |
27/03/2024 |
13.00 PM |
N003-10-2017/9 CPG 020 |
Construction of MSE Wall W336 on N3 On-ramp (Harry Gwala Road) |
Grade 6CE |
6 Months |
26/03/2024 |
13.00PM |
N003-10-2017/9 CPG 021 |
Construction of Insitu Concrete Culvert CL404 on N3 (Westville Viaduct) |
Grade 3CE |
8 Months |
25/03/2024 |
13.00PM |
N003-10-2017/9 CPG 022 |
Construction of Insitu Concrete Culvert CL404 on N3 (Westville Viaduct |
Grade 6CE |
7 Months |
27/03/2024 |
13.00PM |
N003-10-2017/9 CPG 023 |
N3 Steel Reinforcing Supply and Fixing at Lancaster (B0461) |
Grade 4CE |
8 Months |
25/03/2024 |
13.00PM |
N003-10-2017/9 CPG 024 |
Stormwater Drainage on N3 From Km13,2 to Km17.5 |
Grade 4CE |
8 Months |
25/03/2024 |
13.00PM |
Queries relating to issues arising from these documents may be addressed to the following:
Enquiries |
Contact person : Mr. Shane Pillay |
|
E-mail : cpg@aquaexrjv.co.za /shane@lionbee.co.za |